Upgrade IP Deutschneudorf and Lasow
TRA-N-814 Update Date
Project
Pipeline including CS
Non-FID Advanced
25/05/2016
7KH JDV SUHVVXUH UHGXFWLRQ DQG PHWHULQJ VWDWLRQV DW *UR .|ULV DQG .LHQEDXP ZLOO EH XSJUDGHG WR 9Q 0LR P h and Vn 1,7 m h respectively. The transmission pipeline Sayda - Deutschneudorf will be upgraded to DN 800, DP84. The compressor station Sayda will be upgraded to an inlet pressure pmin = 41 bar, outlet pressure pmax = 84 bar and throughput Vn 700 Tm h. The pressure transfer to/from FGL 218 (DN 600, DP 84) will be upgraded to MOPu 84 bar and MOPd 55 bar. These investments will create additional exit capacity to Czechia (at Deutschneudorf IP) and Poland (Lasow IP) for transit/transmission of natural gas arriving in Germany via Nord Stream 2.
Description
Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point
Operator
Year 2016 2019
From Gas System To Gas System Capacity
26.6 GWh/d 14.4 GWh/d
ONTRAS Gastransport GmbH ONTRAS Gastransport GmbH
PL
DEg
DEg
PL
GCP GAZ-SYSTEM/ONTRAS
Comment: Enabled by EUGAL project submitted by GASCADE
45.4 GWh/d
ONTRAS Gastransport GmbH
2019
PL
DEg
Comment: Entry pressure of 63 bar required by GAZ-System
55.2 GWh/d
ONTRAS Gastransport GmbH
2019
DEg
CZ
+RUD 6YDWp .DWHĝLQ\ &= 'HXWVFKQHXGRUI 6D\GD '(
Comment: Enabled by EUGAL project submited by GASCADE
Sponsors Compressor station Sayda ONTRAS Gastransport GmbH
General Information
ONTRAS Gastransport GmbH ONTRAS Gastransport GmbH
Promoter
100% 3UHVVXUH UHGXFWLRQ DQG PHWHULQJ VWDWLRQV DW *UR .|ULV and Kienbaum ONTRAS Gastransport GmbH 100% Transmission pipeline Sayda - Deutschneudorf ONTRAS Gastransport GmbH 100%
Operator
Host Country
Germany Planned
Status
Website Publication Approval Status
Approved
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM