ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 107 of 620
NDP and PCI Information
Schedule
Start Date
End Date 03/2016
Third-Party Access Regime
Pre-Feasibility
Considered TPA Regime Considered Tariff Regime Applied for Exemption
No (The project is not yet part of the recent German NDP 2016. The German NRA by decree of 11th December 2015 had ordered the German TSOs to only modell a 42 % coverage of the expected additional national demand from North East in the scenario Q2 including Nord Stream 2, but no further flows at IPs. )
Regulated Regulated
Feasibility FEED
03/2016
Not Relevant
Part of NDP
Market Test
Exemption Granted
10/2015
No
Permitting Supply Contracts FID Construction Commissioning
Exemption in entry direction Exemption in exit direction
0.00% 0.00%
NDP Number
2016
2019
Currently PCI
No
CBCA Decision Market Survey
No
Not Relevant (no CBCA decision)
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Sayda - Deutschneudorf
800
14 14
14 14
Total
Expected Gas Sourcing
Russia
Benefits
Main Driver Market Demand Main Driver Explanation see Market Survey "More Capacity" (see https://www.more-capacity.eu) Benefit Description