NOWAL - Nord West Anbindungsleitung
TRA-F-291 Update Date
Project
Pipeline including CS
FID
Advanced
10/05/2016
It is necessary to increase the capacity of the pipeline between the OGE Infrastructure (market area of NCG) and GASCADE (Market area of GASPOOL).This connection will increase the capacity by 6 GW to ensure the supply in south-west Germany.
Description
Regulatory Decisions and similar material conditions
Part of the Nation Development Plan 2016: 083-07, 409-01, 410-01, 411-01
Capacity Increments Variant For Modelling Point
Operator
Year 2017
From Gas System To Gas System Capacity
216.0 GWh/d
GASCADE Gastransport GmbH
DEg
DEn
Comment: Level 1 - Exit Drohne
124.8 GWh/d
GASCADE Gastransport GmbH
2020
DEg
DEn
Comment: Level 2 includes Level 1 in total 340.8 GWh/d -Exit Drohne Comment: Level 3 includes Level 1+2 in total 535.2 GWh/d -Exit Drohne DEn
Drohne GASCADE / OGE
194.4 GWh/d
GASCADE Gastransport GmbH
2025
DEg