ENTSOG Tariff NC - Implementation Document 2nd Edition
List of Tables
Table 1
Comparison between clustering and equalisation 43
Table 2
Criteria to distinguish between transmission and non-transmission services 45
Table 3
Comparison between a flow-based charge and CRRC . . . . . . . . . . . . . . . . . . 49
Table 4
The effect of different entry-exit splits on the tariffs 64
Table 5
Current storage discounts applied by European TSOs at regular storages 68
Table 6
Scenarios for multi-TSO arrangements within a MS 70
Table 7
Multipliers, seasonal factors and interruptible discounts for quarterly products at an IP 73
Table 8
Number of days for the standard capacity products 81
Table 9
Use of auction premium in different regulatory regimes 95
Table 10
Conditions for offering payable price approaches 112
Table 11
Responsibility split between TSOs/NRAs for consultation per Article 26(1) 115
Table 12
Content of the final consultation document under Article 26(1) . . . . . . . . . . 116
Table 13
Border date between ‘old’ and ‘new’ tariffs 121
Table 14
Content of the consultation document per Article 28(1) 123
Table 15
Comparison of consultations under Articles 26(1) and 28(1) 126
Table 16
Responsibility split between TSOs/NRAs for publication requirements 129
Table 17
Example 2 of publication of tariff changes and trends 133
Table 18
Form of publication of information on TSO/NRA website and ENTSOG’s TP . . 134
Table 19
Earlier compliance with publication requirements 141
Table 20
Who is doing what 161
Table 21
Clustering points 183
Table 22
Illustrative tariffs 184
Table 23
Tariff for the cluster 184
Table 24
Examples of firm capacity products with ‘conditions’ 185
Table 25
Distances between Entries and Exits 186
Table 26
Average distance to a specific exit (or entry) 187
Table 27
Cost drivers and entry capacity split . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 188
Table 28
Capacity revenue, tariffs, allocation of revenues and conduction of test 189
Table 29
Distances between entries and exits 191
Table 30
Average distance to a specific exit (or entry) 191
Table 31
Cost drivers and entry commodity split 192
Table 32
Commodity revenue, tariffs, allocation of revenues and conduction of test 193
Table 33
List of network points 196
Table 34
Capacity data 199
Table 35
Distance matrix and calculations 200
Table 36
Exit forecasted contracted capacity matrix 203
Table 37
Entry forecasted contracted capacity matrix 204
Table 38
Tariff table at entry points 207
268 |
TAR NC Implementation Document – Second Edition September 2017
Made with FlippingBook Online document