ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 22 of 620

NDP and PCI Information

Schedule

Start Date

End Date 06/2011 01/2017 12/2017 05/2017

Third-Party Access Regime

Pre-Feasibility

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (2016-2025 Ten-year network development plan of BTG)

Regulated Regulated

Part of NDP

Feasibility

01/2015 01/2017

NDP Number

Section 5.3 (5.3.1)

FEED

Not Relevant Not Relevant

Market Test

Exemption Granted

Currently PCI

Yes (6.20.2.)

Permitting Supply Contracts FID

Exemption in entry direction Exemption in exit direction

0.00% 0.00%

CBCA Decision Market Survey

No

01/2019 12/2021

Not Relevant (no CBCA decision)

Construction

01/2020

Commissioning

2022

2022

Technical Information (UGS)

Storage Facility

UGS Chiren

Storage Facility Type

Aquifer

Multiple-Cycle

No

Working Volume (mcm)

450.00

450

PCI Details

Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at supplying directly or indirectly at least two Member States

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

No

Competition, Market Integration, Security of Supply

The project for its expansion aims on one hand at creating conditions to ensure security of supplies to Bulgarian users and users in the countries from the region, and on the other - UGS Chiren development as commercial gas storage in an interconnected regional and Europe- wide market, as UGS Chiren is an integral part of the plans for development of the regional gas system consisting of interconnections, LNG terminals, storage facilities. In the medium term UGS Chiren promises to become a commercial facility with a significant role in competition development in the regional gas market and in provision of additional flexibility of the gas transmission systems at regional level, with a significant contribution to congestion management and seasonal optimization of use of the gas transmission systems.

Specific Criteria Fulfilled Comments

Time Schedule

Grant Obtention Date Delay Since Last TYNDP

yes

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM