ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 2 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (NDP 2016-2025)
Regulated Regulated
GCA 2015/01a
No
Currently PCI
Exemption Granted
Yes (6.4)
06/2016
Not Relevant
Permitting
10/2015
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
No
Supply Contracts FID Construction Commissioning
0.00% 0.00%
Not Relevant (no CBCA decision)
10/2020
2020
2020
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
The technical load factor of the pipeline is confidential and must not be published in the TYNDP.
Austrian Side
Czech Side
800
12 12
0 0
Total
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Benefits
Main Driver Others Main Driver Explanation Market Integration