Interconnection Bulgaria - Serbia
TRA-F-137 Update Date
Project
Pipeline including CS
FID
Advanced
27/05/2016
IBS aims at connecting the national gas transmission networks of Bulgaria and Serbia. It will be implemented in 3 stages. 1st: a pipe will be built from Novi Iskar to Kalotina, BG (62.2 km) and from Nis to Dimitrovgrad, SR (108 km), with capacity from BG to SRB - 1,0 bcm/year, and from SRB to BG - 0.15 bcm/year. 2nd: the capacity will be increased from BG to SRB to 2,4 bcm/year, and from SRB to BG to 0,95 bcm/year, and later to 1,5 bcm/year, by construction of 2 CSs (20 MW each) and 2 new gas pipeline sections (from G Bogrov CS to N Iskar ² km and from V. Orašje to Nis ² km). 3rd: by construction of the looping VS Batulsi - G Bogrov CS (62 km) the capacity from BG to SRB will be increased to 3,2 bcm/year. In the direction from SRB to BG the construction of the pipeline Batajnica - V Orašje (116 km) will ensure transmission of 2 bcm/ year, and the construction of CS %DWRÿLQD 0: ZLOO LQFUHDVH WKH FDSDFLW\ IURP EFP \HDU WR XS WR EFP \
Description
Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point
Operator
Year 2018
From Gas System To Gas System Capacity
51.0 GWh/d
IBS Future Operator
BGn
RS
Comment: Opeartor to be defined
Interconnector BG RS
51.0 GWh/d
IBS Future Operator
2018
RS
BGn
Comment: Operator to be defined
Sponsors Bulgarian section Ministry of Energy of Bulgaria
General Information
Promoter Operator
Ministry of Energy IBS Future Operator
100%
Host Country
Bulgaria Planned
Serbian section Serbijagas
Status
100%
Website
Project's URL
Publication Approval Status
Approved
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM