ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 19 of 620
NDP and PCI Information
Schedule
Start Date
End Date 02/2011 12/2012 05/2017 08/2016 04/2017 12/2012 12/2018
Third-Party Access Regime
Pre-Feasibility
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (2016-2025 Ten-year network development plan of BTG)
Regulated Regulated
Part of NDP
Feasibility
12/2011
NDP Number
Sectin 5.2 (5.2.3)
FEED Market Test Permitting
No No
Exemption Granted
Currently PCI
Yes (6.10.)
Exemption in entry direction Exemption in exit direction
Supply Contracts
0.00% 0.00%
CBCA Decision Market Survey
No
FID
Not Relevant (no CBCA decision)
Construction
05/2017
Commissioning
2018
2018
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Bulgarian territory Serbian territory
1.8 bcm/y maximum capacity 1.8 bcm/y maximum capacity
700 700
62
108 170
Total
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project concerns investment in reverse flow capacity, Project aims at supplying directly or indirectly at least two Member States
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Expected Gas Sourcing
Caspian Region, LNG (GR)
Benefits
Main Driver
Others
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Made with FlippingBook