ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 138 of 620
Underground Gas Storage in salt leached caverns in the Bages area (ES)
UGS-N-127 Update Date
Project
Storage Facility
Non-FID
Non-Advanced
22/06/2016
Underground storage in underground caverns to be constructed by salt leaching to be carried out on the base salt of the potassium formation from Ecocene in the catalan sector of the Ebro river
Description
Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point
Operator
Year 2023 2023
From Gas System To Gas System Capacity
156.0 GWh/d 99.0 GWh/d
gasNatural fenosa gasNatural fenosa
STcES
ES
Position 5D.02 of ENAGAS pipeline from Martorell to Figueras
ES
STcES
Sponsors 3HWUROHXP 2LO *DV (VSDxD 6 $
General Information
100%
Promoter Operator
Gas Natural
gasNatural fenosa
Host Country
Spain
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Made with FlippingBook