ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects

Print

TRA-N-137

Interconnection Bulgaria - Serbia

Non-FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter

Public Financing

Bulgarian Ministry of Economy and Energy (MEE)

Not part of TEN-E

TEN-E Project ?

99%

Operator

Private Financing

Bulgartransgaz EAD

Yes

In PCI list ?

Multilateral Financing

3

IGAs

Web Link

www.bulgartransgaz.bg

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Considered TPA Regime

End of permitting phase

# of Pipelines, nodes, CS

Regulated

2014

2

Considered Tariff Regime

FID

Total Pipeline Length (km)

Regulated

2014

+155

Applied for Exemption ?

Construction

Total Compressor Power (MW)

No

2015

Exemption granted ?

Commissioning

Expected Load Factor

No

2015

% Exemption in entry direction

Last completed Phase :

Diameter (range) (mm)

Planned

DN 700

% Exemption in exit direction

Diameter (range) (inches)

28"

Southern Corridor GRIP 2014–2023 Annex B |

92

ENTSOG TYNDP 2013-2013 - Annex A

Made with