ENTSOG South-North Corridor GRIP 2017 - Main Report

7 NETWORK MODELLING

82 7.1 Introduction 83 7.2 Modelled Cases 83 7.2.1 Years 83 7.2.2 Infrastructure 84 7.2.3 Demand 84 7.2.4 Supply and Price Configurations 86 7.3 Assessment Results 87 7.3.1 Case study 1a/1b 89 7.3.2 Case study 1c/1d 90 7.3.3 Case study 2a/2b 91 7.3.4 Case study 2c/2d 92 7.3.5 Case study 3a/3b 93 7.3.6 Case study 3c/3d 94 8.1 Investments in Belgium and Luxembourg (Northern Area of the Region) 97 8.1.1 Belgium 97 8.1.1.1 Market and Network Overview 97 8.1.1.2 Milestones 98 8.1.1.3 Investment plan Fluxys Belgium: The Program in a Nutshell 99 8.1.1.4 Zeebrugge LNG Terminal: the LNG Gateway into Northwestern Europe 99 8.1.1.5 L/H Conversion 101 8.1.2 Luxembourg 103 8.2 Investments in France (Western Area of the Region) 104 8.2.1 Creating a Single Marketplace in France in 2018 104 8.2.2 Creating a Reverse Capacity from France to Germany at Obergailbach 106 8.2.3 Reinforcing Interconnections between France and Spain 106 8.2.4 Expanding LNG Terminals in Montoir and Fos-sur-Mer 107 8.2.5 Ensuring the L-gas Conversion Process 107 96

8 OTHER TSO TRANSMISSION PROJECTS IN THE REGION

4 |

South-North Corridor GRIP 2017

Made with