ENTSOG South-North Corridor GRIP 2017 - Main Report

8.3 Investments in Germany (Eastern Area of the Region) 108 8.3.1 Market Conversion Projects L- to H-gas in the GASPOOL Market Area 109 8.3.2 Market Conversion Projects L- TO H-GAS in the NCG Market Area Including the ZEELINK Project 109 8.3.3 NCG Market Area TSO projects – Technical Capacities from/to Gas Storages and to DSO Systems 109 8.3.4 Projects to Enable Physical Capacity to Transport Gas in both Directions Between Member States 110 8.3.5 TENP Reverse Flow Project 110 8.3.6 “MONACO” (Phase I) 110 8.3.7 “More Capacity” 110 8.3.7.1 “EUGAL” Project 111 8.3.7.2 “Expansion NEL” Project 111 8.3.7.3 Transport of Gas Volumes to the Netherlands 111 8.3.7.4 Upgrade IP Deutschneudorf and Lasów 111 8.3.8 Project Overview 112 8.4 Investments in Italy (Southern Area of the Region) 113 8.4.1 Development for New Imports from the South 113 8.4.2 Interconnection with Slovenia 114 8.4.3 Additional Southern Developments 114 8.4.4 Import Developments from Northeast 114 8.4.5 Sardinia Methanisation 114

WAY FORWARD – STAKEHOLDERS FEEDBACK FORM 117

LIST OF TABLES

116

LIST OF FIGURES

116

LEGAL DISCLAIMER

121

ABBREVIATIONS

122

South-North Corridor GRIP 2017 |

5

Made with