ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 8 of 620

Břeclav-Baumgarten Interconnection (BBI) AT

TRA-N-801 Update Date

Project

Pipeline including CS

Non-FID Advanced

04/05/2016

The project will be a new infrastructure directly connecting the Austrian and Czech market and is connected to the project C4G of N4G at the AT/CZ border.

Description

Regulatory Decisions and similar material conditions

Capacity Increments Variant For Modelling Point

Operator

Year 2020

From Gas System To Gas System Capacity

1,118.1 GWh/d

Gas Connect Austria GmbH

CZ

AT

Poštorná / Reintal

Comment: The incremental capacity represents an entry capacity extension above planned exit capacity at CZ/AT border. GCV:11.19

Sponsors

General Information

GAS CONNECT AUSTRIA GmbH Gas Connect Austria GmbH

Promoter

Operator

Host Country

Austria Planned

Status

Website Publication Approval Status

Approved

Enabled Projects

Project Code Project Name TRA-N-021 Bidirectional Austrian-Czech Interconnector (BACI, formerly LBL project)

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B | 10

Made with FlippingBook - Online catalogs