ENTSOG GRIP BEMIP 2014-2023 / Annex: Infrastructure Projects
PROJECTED CAPACITY INCREASES
Interconnection
Capacity (GWh/d)
From Zone
To Zone
Modelled Direction
Mallnow
Yes
entry
168.00
Hub Germany (GASPOOL)
Yamal (Poland)
DESCRIPTION OF THE PROJECT
The project aims to introduce physical reverse flow on the Yamal-Europe pipeline (flow in the direction from DE to PL). The project increases security of supply to Poland by diversifying supply sources and routes. Implementation of the project facilitates the access of the network users in Poland to the gas market in Germany.
EXPECTED BENEFITS
COMMENTS ABOUT THE PROJECT FINANCING
Public financing
Private financing
Multilateral financing
Baltic Energy Market Interconnection Plan GRIP 2014–2023 Annex | 4
Made with FlippingBook