ENTSOG GRIP BEMIP 2014-2023 / Annex: Infrastructure Projects

Print

Upgrade of the entry points in Lwówek and Włocławek on the

293

TRA-N-276

Upgrade of the entry points in Lwówek and Włocławek on the Yamal-Europe pipeline

Non-FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter

GAZ-SYSTEM S.A.

Operator

GAZ-SYSTEM S.A.

TEN-E Project ?

Not part of TEN-E

Interested by PCI ?

Yes

IGAs

None

Web Link

Undefined (100,00%)

Gas Transmission OperatorGAZ- SYSTEM S.A. (100%)

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Considered TPA Regime

End of permitting phase

# of Pipelines, nodes, CS

Regulated

2

Considered Tariff Regime

Regulated

FID

Total Pipeline Length (km)

Total Compressor Power (MW)

Applied for Exemption ?

No

Construction

Exemption granted ?

Not relevant

Commissioning

2015

Expected Load Factor

% Exemption in entry direction

Last completed Phase :

0%

Planned

% Exemption in exit direction

0%

Baltic Energy Market Interconnection Plan GRIP 2014–2023 Annex | 30