ENTSOG GRIP BEMIP 2014-2023 / Annex: Infrastructure Projects
Upgrade of the entry points in Lwówek and Włocławek on the
293
TRA-N-276
Upgrade of the entry points in Lwówek and Włocławek on the Yamal-Europe pipeline
Non-FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter
GAZ-SYSTEM S.A.
Operator
GAZ-SYSTEM S.A.
TEN-E Project ?
Not part of TEN-E
Interested by PCI ?
Yes
IGAs
None
Web Link
Undefined (100,00%)
Gas Transmission OperatorGAZ- SYSTEM S.A. (100%)
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Considered TPA Regime
End of permitting phase
# of Pipelines, nodes, CS
Regulated
2
Considered Tariff Regime
Regulated
FID
Total Pipeline Length (km)
Total Compressor Power (MW)
Applied for Exemption ?
No
Construction
Exemption granted ?
Not relevant
Commissioning
2015
Expected Load Factor
% Exemption in entry direction
Last completed Phase :
0%
Planned
% Exemption in exit direction
0%