GRIP CEE 2017 / Main Report

The analysis for the 2017, 2020, and 2025 summer periods did not identify any problem with covering the average summer domestic demand and to meet the injection requirements of underground storage facilities in the whole CEE region.

LT

DK

2019

2022

Disrupted connection (BY) Disrupted connection (BY) Disrupted connection (BY)

PL

2020

2019

2019

DE

SK

CZ

2019

2021

2020

AT

HU

2021

RO

2024

2020

SI

2023

IT

2023

HR

2018

2021

BG

2018

2023

2017 2020 2025 Direction of gas flow:

2019

2021 2020

GR

Cross-border Entry/Exit capacity 2017 (EP_IN / XP_OUT) Cross-border Entry/Exit capacity – planned 2018-2026 (EP_IN / XP_OUT) UGS/Production Entry Capacity (S / P) – withdrawal UGS Exit Capacity (S_X) – injection Domestic Exit Capacity required for Demand (D_MAX / D_AS)

Figure 4.11: Direction of gas flow considered at interconnection points at Polish borders under a disruption via Belarus