GRIP CEE 2017 / Main Report
The analysis for the 2017, 2020, and 2025 summer periods did not identify any problem with covering the average summer domestic demand and to meet the injection requirements of underground storage facilities in the whole CEE region.
LT
DK
2019
2022
Disrupted connection (BY) Disrupted connection (BY) Disrupted connection (BY)
PL
2020
2019
2019
DE
SK
CZ
2019
2021
2020
AT
HU
2021
RO
2024
2020
SI
2023
IT
2023
HR
2018
2021
BG
2018
2023
2017 2020 2025 Direction of gas flow:
2019
2021 2020
GR
Cross-border Entry/Exit capacity 2017 (EP_IN / XP_OUT) Cross-border Entry/Exit capacity – planned 2018-2026 (EP_IN / XP_OUT) UGS/Production Entry Capacity (S / P) – withdrawal UGS Exit Capacity (S_X) – injection Domestic Exit Capacity required for Demand (D_MAX / D_AS)
Figure 4.11: Direction of gas flow considered at interconnection points at Polish borders under a disruption via Belarus
Central Eastern Europe GRIP 2017 |
57