The analysis for the 2017 summer period resulted in the identification of a problem in Bulgaria. Due to the lack of gas in Bulgaria that would be caused by a gas supply disruption via Ukraine, there would be no gas for the underground storage facilities in Bulgaria during the summer. This situation could lead to a deepening of the problem identified during the winter period, because the underground storage facil- ities would be empty. This problem will be solved by the implementation of planned infrastructure projects in upcoming years. During the 2017 summer period, poten- tial problems in injecting gas into underground storage facilities in Hungary and Romania were also identified, but only if the disruption lasted more than 45 and 138 days, respectively. A potential problem was also identified in Austria (only if the disruption lasted more than 116 days), but this would be caused by the fact that IP Baumgarten is used in the AT>SK direction in the analysis. If it had been used in the other direction, Austria would have no problem. In the 2020 summer period, the potential problem of injecting gas into underground storage facilities was detected in Hungary, but only if the gas supply disruption through Ukraine lasted longer than 37 days. The commissioning of projects in subsequent years will respond to all identified problems.

LT

DK

2019

2022

PL

2020

Disrupted connection (UA) Disrupted connection (UA)

2019

2019

DE

SK

CZ

2019

Disrupted connection (UA) Disrupted connection (UA)

2021

2020

Disrupted connections (UA)

AT

HU

2021

RO

2020

2024

SI

2023

IT

Disrupted connections (UA)

HR

2023

2018

BG 2021

2023

2018

2017 2020 2025 Direction of gas flow:

2020

2019

2021

GR

Cross-border Entry/Exit capacity 2017 (EP_IN / XP_OUT) Cross-border Entry/Exit capacity – planned 2018-2026 (EP_IN / XP_OUT) UGS/Production Entry Capacity (S / P) – withdrawal UGS Exit Capacity (S_X) – injection Domestic Exit Capacity required for Demand (D_MAX / D_AS)

Figure 4.10: Direction of gas flow considered at each interconnection point under disruption via Ukraine