GRIP CEE 2017 / Main Report
4.2.2 BULGARIA (BG)
The following picture shows the main supply corridor for Bulgaria which under nor- mal conditions runs through Ukraine, Moldova, and Romania (at the figure marked BG1). Other gas supply corridors in case of supply disruption through Ukraine are through Greece (marked BG2; this connection can be used in reverse-flow mode during emergency situations which is in line with the requirement of REG 994/2010) and through Romania (marked BG3). The four new cross-border interconnections are planned from 2019.
PL
DE
SK
CZ
AT
HU
RO
SI
HR
BG1
2021
BG3
BG
2018
Cross-border Entry/Exit capacity 2017 (EP_IN / XP_OUT) Cross-border Entry/Exit capacity – planned 2018-2026 (EP_IN / XP_OUT) UGS/Production Entry Capacity (S / P) – withdrawal UGS Exit Capacity (S_X) – injection Domestic Exit Capacity required for Demand (D_MAX / D_AS)
BG2
2021 2020
2019
GR
BG1 Main Supply Corridor for BG BG2 2 nd Supply Corridor for BG (act as reverse-flow in line with the requirements of Regulation 994/2010) BG3 3 rd Supply Corridor for BG
Figure 4.2: CEE Region N-1: BG
Central Eastern Europe GRIP 2017 |
43
Made with FlippingBook