ENTSOG Tariff NC - Implementation Document 2nd Edition
Chapter II: Reference Price Methodologies
This Chapter has the following structure: after an introduction, Articles 6 to 8 address ‘general requirements’ for RPM; Article 9 elaborates on ‘adjustments at certain points’, meaning points to/from storage facilities, from LNG facilities and to/from infrastructure ending the isolation of MSs; Articles 10 and 11 set out the arrangements in ‘multi-TSO entry-exit systems’.
Image courtesy of Conexus
54 |
TAR NC Implementation Document – Second Edition September 2017
Made with FlippingBook Online document