ENTSOG Tariff NC - Implementation Document 2nd Edition
List of Figures
Figure 1
NC establishment process 15
Figure 2
Application of the TAR NC rules at different points on the transmission network 32
Figure 3
The TAR NC scope at different points of transmission networks 33
Figure 4
Application of the TAR NC rules at points with third countries 34
Figure 5
Definitions: revenue and tariffs 36
Figure 6
Definitions: cycle of transmission services revenue, tariffs and services 37
Figure 7
Definitions: reference prices and capacity-based transmission tariffs 39
Figure 8
TAR NC regulatory regimes 40
Figure 9
Different regulatory periods in ENTSOG’s Members 41
Figure 10
Different tariff periods for ENTSOG’s Members 41
Figure 11
Basis for performing cost allocation assessments 50
Figure 12
Link between revenue reconciliation, cost allocation, reference price determination and revenue recovery 55
Figure 13
Possible components of a RPM 56
Figure 14
Current adjustments applied by European TSOs 57
Figure 15
Principles for the choice of a RPM 60
Figure 16
Balance for CWD RPM 61
Figure 17
Simple example of airline distance calculation 63
Figure 18
Current entry-exit splits applied by European TSOs 65
Figure 19
Discounts at entry-points-from/exit-points-to storage facilities and infrastructure ending the isolation, and at entry-points-from LNG facilities 66 Multi-TSO arrangements in an entry-exit system within one MS and covering more than one MS 69
Figure 20
Figure 21
Separate reserve prices published in June 2018 for auctions in July 2018 75
Figure 22
Level of multipliers and seasonal factors 78
264 |
TAR NC Implementation Document – Second Edition September 2017
Made with FlippingBook Online document