ENTSOG Tariff NC - Implementation Document 2nd Edition
Entry A2
Connected point A+B
250
Entry B1
150
500
50
300
50
200
150
Exit Dom B2
Exit Dom A3
Exit A4
TSO A+B
TSO A Total length: 950 km
TSO B Total length: 700 km
Figure 68: Distance map after the merger
Capacity Weighted Distance Approach (joint application)
TSO A + B
Allowed Revenues
135.00m€
E/E-Split
Entry
50%
Exit
50%
Revenues
Entry
67.50m€
Exit
67.50m€
Fcap – Proportions
Entry A2
14%
Entry B1
86%
Exit Dom A3
71%
Exit Dom B2
21%
Exit A4 7% Calculation of capacity-weighted average distance Entry A2 546
Entry B1
925
Exit Dom A3
921
Exit Dom B2
600
Exit A4
1,179
Calculation of the weight of each point Entry A2
9%
Entry B1
91%
Exit Dom A3
76%
Exit Dom B2
15%
Exit A4
10%
Allocation of costs
Entry A2
6.05m€
Entry B1
61.45m€
Exit Dom A3
51.01m€
Exit Dom B2
9.96m€
Exit A4
6.52m€
Determination of tariffs – €/kWh/h Entry A2
3.03
Entry B1
5.12
Exit Dom A3
5.10
Exit Dom B2
3.32
Exit A4
6.52
Table 48: CWD tariff derivation after the merger (joint case)