ENTSOG Tariff NC - Implementation Document 2nd Edition
Part I SAME RPM FOR THE TWO TSOs IN DIFFERENT ENTRY–EXIT SYSTEMS
Situation before merging: each TSO has its own market area
Entry A2
Entry A1
Exit B3
Entry B1
Exit Dom B2
Exit Dom A3
Exit A4
TSO A
TSO B
Figure 65: Map of networks before the merger
Assumptions regarding technical and forecasted capacity bookings, as well as allowed revenues, are given in the following table. The entry-exit split is calculated with data on forecasted capacity bookings, with the same equality in the distribution of entry and exit bookings for both TSOs, half capacity being booked in entry and half in exit.
INPUT DATA
Technical cap. – GWh/h Forecast – GWh/h Allowed Revenue – m€ Entry/Exit Split: Entry Entry/Exit Split: Exit
Entry A1 Entry A2
10
9 2
4
TSO A
70m€
50%
50%
Exit Dom A3
11
10
Exit A4
3
1
Entry B1
13
12
TSO B
65m€
50%
50%
Exit Dom B2
3
3 9
Exit B3
10
Table 40: Input data for networks before the merger