– – Point O: a consumption point connected to the TSO bidirectional network, near a storage point, a production point and IPs, – – Point P: a consumption point connected to the TSO bidirectional network, near another consumption point, a production point and IPs, – – Point Q: an IP only allowing entry flows, not connected to the TSO bidirectional network (no flows from/to it), purely for cross-system use, – – Point R: an IP only allowing exit flows, not connected to the TSO bidirection- al network (no flows from/to it), purely for cross-system use, – – Point S: a point where unidirectional pipelines from production and LNG points connect to the TSO bidirectional network, – – Point T: a point where a pipeline from production connects to the TSO bidirectional network. Assumptions regarding technical capacity and forecasted bookings at entry and at exit points are in the next 2 tables (points S and T are not represented because they are neither entry nor exit points). Capacity unit is for instance kWh/d , and there is no specified capacity unit in Article 8 of TAR NC (others are possible). This is a pure example, where units are not under the focus, and therefore data for revenues and capacity tariffs should be rescaled to reflect the reality of TSO tariffs . Tariffs derived with the CWD counterfactual are defined for the same runtime as tariffs for the RPM, i. e. per year. In the current case, tariffs are therefore in (kWh/d)/y .

CAPACITY DATA

Entry points

En Technical Cap

F'st Contracted En

Storage

A

8

4

IP

B

70

68

Storage

C

7

4

Production Production

D

10

4

E

10

6

LNG

F

30

30

Production

G

20

20

IP IP IP

I

10

3

J

10

8

K

60

60

LNG

L

30

30

IP IP

M

80

80

Q

90

20

Exit points

Ex Technical Cap

F'st Contracted Ex

Storage

A

8

1

IP

B

100

90

Storage

C

7

2

Consumption

H

60

60

IP IP IP

I

50

50

K

60

40

M

90

90

Consumption Consumption Consumption

N

20

10

O

50

50

P

10

10

IP

R

97

24

Table 34: Capacity data