Equalisation At first, the distances between each entry and exit point of the system were deter- mined. Those distances and the given capacity are the inputs to apply the RPM if such RPM employs distance as a cost driver. Illustrative tariffs resulting from an RPM could be:
Exit tariffs
C1
4
C2
2
C3
5
Table 22: Illustrative tariffs
The ex-post equalisation consists of calculating tariffs e. g. by using a capacity- weighted average approach per following formula:
Where: T
is the tariff of the equalised points
T n
is the tariff of a point
C n
is the capacity of a point
The calculated tariffs would be applied to any consumption point.
Capacity Exit
Exit tariffs
C1
4
15
C2
2
10
C3
5
5
VCP
3,5
Table 23: Tariff for the cluster