Reference to the Transparency Guidelines Point 3.2(1)(a) of the Transparency Guidelines exempts certain points from some of the TAR NC transparency requirements: those exit points connected to a single final customer, and entry points linked directly to a production facility of a single producer located within the EU. Grounds of confidentiality and commercial sensitivity exempt two information items at those points: forecasted contracted capacity and forecasted flows. Publication of the two information items can still occur in aggregated format, at least per balancing zone as specified in point 3.2(2) of the Transparency Guidelines, which matches the level of granularity for publishing other information at such points under the Transparency Guidelines.
How to Publish
ARTICLE 31 FORM OF PUBLICATION
Responsibility: publication by TSO/NRA, as NRA decides
The TAR NC sets out the requirements for publishing information on TSO/NRA websites and on ENTSOG’s TP. Table 18 outlines similarities and differences for the publication of tariff information on these websites, in particular in the columns ‘how’, ‘for which points’ and ‘language’.
FORM OF PUBLICATION OF INFORMATION ON TSO/NRA WEBSITE AND ENTSOG’S TP
Similarities
Differences
Where
When
How
What
For which points
Language
Additional
\\ At least 30 days before auctions \\ At least 30
\\ In a user- friendly manner \\ Clear, easily accessible way \\ On a non- discriminatory basis \\ Downloadable format
All tariff information
All points on the system
In official language(s) of MS + in English, to the extent possible
Plus a link on ENTSOG’s TP
On the website of TSO/NRA
days before the tariff period
IPs by default 1)
Some tariff information: \\ Reserve prices
In English only In a standardised table
Directly on ENTSOG’s TP
\\ Flow-based charge \\ Simulation of all costs for flowing 1 GWh/day/ year
Table 18: Form of publication of information on TSO/NRA website and ENTSOG’s TP
1) The standardised table may capture also non-IPs.