1. Information on parameters used in the applied RPM, such as:
2. Information on the TSO revenue
3. Information on transmission and non-transmission tariffs
for all entries and for all exits
allowed/target revenue
commodity- based transmis- sion tariffs
plus information related to derivation
technical capacity
associated assumptions
yearly changes to allowed/target revenue
revenue level
non-transmis- sion tariffs
plus information related to derivation
for all entries and for all exits
transmission services revenue
forecasted contracted capacity
reference prices applicable at non- IPs where CAM NC is not applied
associated assumptions
plus information related to derivation
capacity/ commodity split
splits of revenue
for all entries and for all exits
entry/exit split
quantity and direction of gas flows
other prices applicable at non-IPs where CAM NC is not applied
intra-system/ cross-system split
associated assumptions, e.g. demand and supply scenarios for the gas flow under peak conditions
plus information related to derivation
actually obtained revenue
under-/over-recovery of allowed revenue
network representation
appropriate level of detail
4. Other information
part of under-/over- recovery attributed to reg. account/ sub-accounts
info on regulato- ry account reconciliation
lengths of pipelines
tariff changes
explanation of
technical information about network
diameters of pipelines
tariff trends
reconciliation period
power of compressor stations
incentive mechanisms implemented
at least a simplified tariff model
types of assets in RAB and their aggre- gated value
methodologies to determine the initial values of assets
cost of capital and calculation methodology
methodologies to re-evaluate assets
capital expenditures
parameters
explanation ot the evolution of the value of assets
operational expenditures
depreciation periods and amounts per asset type
incentive mechanisms and efficiency targets
inflation indices
Figure 35: Information for publication before the tariff period