ENTSOG Tariff NC - Implementation Document 2nd Edition
The consultation document for the final consultation must include information listed in Table 12. The section below describes the difference between the ‘final’ and the ‘intermediate’ consultations.
CONTENT OF THE FINAL CONSULTATION DOCUMENT UNDER ARTICLE 26(1)
Article 26 (1)
Content of consultation
Comparison with Articles 29 and 30
Assumptions and justification for parameters used in the proposed RPM per Article 30(1)(a)
Article 30(1)(a): examples are provided, ‘justification’ is not covered
(a) Proposed RPM
Proposed adjustments for points with storage, LNG facilities and infrastructure ending isolation of a MS per Article 9
Article 30(1)(c)(iii): part of the ‘reference prices and other prices applicable at points other than where the CAM NC applies’ Article 29: reserve prices at points where the CAM NC applies Article 30(1)(c)(iii): part of ‘reference prices at points other than where the CAM NC applies’
Indicative reference prices
Results, components and their details for CAA per Article 5
Article 30(1)(v)(3): partially covered by ‘intra-system/cross-system split’
Assessment of the RPM
Not covered
Comparison of RPM to the CWD in Article 8
Not covered
Indicative allowed and / or target revenue
Article 30(1)(b)(i): allowed and/or target revenue
(b) Revenue and splits
Indicative transmission services revenue
Article 30(1)(b)(iv): transmission services revenue
Indicative splits of capacity-commodity revenues, entry-exit revenues, intra-system/cross-system revenues
Article 30(1)(b)(v): splits of capacity-commodity revenues, entry-exit revenues, intra-system / cross-system revenues Article 30(1)(c): covered by ‘relevant information related to their [tariffs] derivation’ Article 30(1)(b)(v)(1): covered by ‘capacity-commodi- ty split’ for commodity-based transmission tariffs Article 30(1)(b)(i) and (iv): covered by ‘allowed and / or target revenue’ and ‘ transmission services rev- enue’ for non-transmission tariffs
Manner in which they are set
(c) Commodity- based and
non-transmis- sion tariffs
Share of the allowed or target revenue to be recovered by these tariffs
For non-transmission tariffs, manner of revenue reconciliation
Not covered
Indicative tariffs
Article 30(1)(c)(i): commodity-based transmission tariffs Article 30(1)(c)(ii): non-transmission tariffs
Changes in tariffs for comparable services from the prevailing tariff period to the tariff period for which information is published – indicative comparison between: (1) prevailing tariffs at the time when the consultation document is published; and (2) indicative tariffs based on the proposed RPM Changes in tariffs for comparable services from the tar- iff period for which information in published to each subsequent tariff period until the end of the prevailing regulatory period – indicative forecast based on the proposed RPM
Article 30(2)(a)(i)
(d) Changes in
transmission tariffs
Article 30(2)(a)(ii)
At least a simplified tariff model to calculate tariffs and estimate a possible future evolution
Article 30(2)(b)
Proposed index
Not covered
(e) Fixed
payable price approach
Risk premium: calculation and proposed use
Not covered
Where and when such approach is proposed
Not covered
Process for offering capacity at IPs where both fixed and floating price approaches are offered
Not covered
Table 12: Content of the final consultation document under Article 26(1)
116 |
TAR NC Implementation Document – Second Edition September 2017