FID PROJECTS WITHOUT A DIRECT CAPACITY IMPACT IN THE LOW INFRASTRUCTURE LEVEL – FID projects requiring an additional advanced or less-advanced project to produce a capacity impact – Internal FID projects enabling cross-border capacity development – FID projects not connected to the European mainland gas infrastructure

Commissioning Year

Code

Name

Country

LNG-F-229 Zeebrugge LNG Terminal – 5 th Tank & 2 nd Jetty

Belgium 2019

Interconnection Croatia/Slovenia (Lučko – Zabok – Rogatec)

TRA-F-86

Croatia

2019

TRA-F-937 Nord Stream 2

Germany

2019

TRA-F-1028 Albania – Kosovo Gas Pipeline

Albania

2022

TRA-F-334 Compressor station 1 at the Croatian gas transmission system

Croatia

2017

TRA-F-337 CS Rothenstadt

Germany

2018

TRA-F-343 Pipeline project “Schwandorf-Finsing”

Germany

2018

TRA-F-344 Compressor station “Herbstein”

Germany

2018

TRA-F-345 Compressor station “Werne”

Germany

2018

TRA-F-753 West to East operation of the IP Waidhaus

Germany

2018

LNG-F-183 Tenerife LNG Terminal

Spain

2020

LNG-F-163 Gran Canaria LNG Terminal

Spain

2021

TRA-F-017 System Enhancements – Eustream

Slovakia

2026

United Kingdom

TRA-F-025 Industrial Emissions Directive (IPPC)–FID

Unknown

Table 6.2: FID projects without a direct capacity impact in the low infrastructure level  1) 2)

The projects are considered in the low infrastructure level assessment starting from the year after their expected commissioning date. The relevant capacities for this infrastructure level can be found in the Annex D  1) . As a result of this assessment, the investment gaps, notably with respect to cross-border capacities, have been identified and are presented in the following sub-chapters. The assessment results are shown based on a representative selection of the investigated cases. This means where there is little to no difference between investigated cases, not all are displayed in order to improve the user-friendly experience. All other results are published in Annex E.

 1) Sheets LNG, Storage and Transmission, “Low” in column I