Construction of a Looping CS Provadia ² Rupcha village
TRA-N-594 Update Date
Project
Pipeline including CS
Non-FID
Non-Advanced
27/05/2016
Modernisation of the existing network for transit transmission with the construction of 50 km looping with prevailing diameter Dn 1200 from Provadia to the village of Rupcha, replacement of 20 km Ȝ km) 12 of existing gas pipelines with diameter of Dn 1000 from CS Strandja to the border with Turkey and increase in the capacity of CS Strandja with 10 MW. The realization of the project will ensure new capacity of 6 bcm/y (192,5 GWh/d) to Turkey.
Description
Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point
Operator
Year 2022
From Gas System To Gas System Capacity
192.5 GWh/d
Bulgartransgaz EAD
BGg/BGT
TRe
Strandzha (BG) / Malkoclar (TR)
Comment: a new looping
Sponsors Provadia - Rupcha Bulgartrasngaz EAD Strandja-IP BG/TR Bulgartrasngaz EAD
General Information
Promoter Operator
Bulgartransgaz EAD Bulgartransgaz EAD
100%
Host Country
Bulgaria Planned
Status
100%
Website
Project's URL
Publication Approval Status
Approved