ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 4 of 620
GCA 2015/08: Entry/Exit Murfeld
TRA-N-361 Update Date
Project
Pipeline including CS
Non-FID Advanced
06/05/2016
The Project enables incremental capacity at the IP Murfeld in both directions (AT->SI, SI->AT). Moreover, physical RF capacity at the Entry Point Murfeld is achieved.
Description
Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point
Operator
Year 2019
From Gas System To Gas System Capacity
53.7 GWh/d
Gas Connect Austria GmbH
AT
SI
Comment: conversion from Nm h to kwh/h with a GCV of 11.19
Murfeld (AT) / Ceršak (SI)
166.5 GWh/d
Gas Connect Austria GmbH
2019
SI
AT
Comment: conversion from Nm h to kwh/h with a GCV of 11.19
Sponsors
General Information
GAS CONNECT AUSTRIA GmbH Gas Connect Austria GmbH
Promoter
Operator
Host Country
Austria Planned
Status
Website Publication Approval Status
Approved
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM