ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 36 of 620

NDP and PCI Information

Schedule

Start Date

End Date 01/2017

Third-Party Access Regime

Pre-Feasibility

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (2016-2025 Ten-year network development plan of BTG)

Regulated Regulated

Part of NDP

Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning

NDP Number

Section 5 (5.1.3. )

Not Relevant Not Relevant

Exemption Granted

Currently PCI

Yes (6.8.4.)

Exemption in entry direction Exemption in exit direction

0.00% 0.00%

CBCA Decision Market Survey

No

Not Relevant (no CBCA decision)

2018

2018

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

A project for the construction of a gas pipeline (pipelines) aiming at exp

Total

PCI Details

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Time Schedule

Grant Obtention Date Delay Since Last TYNDP

yes

Delay Explanation

The project is under consideration.

Expected Gas Sourcing

Algeria, Caspian Region, LNG (?), Southern gas corridor gas sources