ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 36 of 620
NDP and PCI Information
Schedule
Start Date
End Date 01/2017
Third-Party Access Regime
Pre-Feasibility
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (2016-2025 Ten-year network development plan of BTG)
Regulated Regulated
Part of NDP
Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning
NDP Number
Section 5 (5.1.3. )
Not Relevant Not Relevant
Exemption Granted
Currently PCI
Yes (6.8.4.)
Exemption in entry direction Exemption in exit direction
0.00% 0.00%
CBCA Decision Market Survey
No
Not Relevant (no CBCA decision)
2018
2018
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
A project for the construction of a gas pipeline (pipelines) aiming at exp
Total
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Time Schedule
Grant Obtention Date Delay Since Last TYNDP
yes
Delay Explanation
The project is under consideration.
Expected Gas Sourcing
Algeria, Caspian Region, LNG (?), Southern gas corridor gas sources
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM