ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 30 of 620

NDP and PCI Information

Schedule

Start Date

End Date 12/2016 08/2017

Third-Party Access Regime

Pre-Feasibility

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (2016-2025 Ten-year network development plan of BTG)

Not Applicable Not Applicable Not Relevant Not Relevant

Part of NDP

Feasibility

NDP Number

Section 5.5.

FEED Market Test Permitting

Exemption Granted

05/2017 11/2018 11/2018

Currently PCI

Yes (6.8.2.)

Exemption in entry direction Exemption in exit direction

Supply Contracts

0.00% 0.00%

CBCA Decision Market Survey

No

FID Construction

Not Relevant (no CBCA decision)

11/2020

Commissioning

2020

2020

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Conditional infrastructure required after the final investment decision on the realization of IBS Stage 2 related to a capacity increase of 1.8 to 3.2 bcm/y.

Gorni Bogrov - Novi Iskar

700

19

20

Lozenets-Nedyalsko

1,000

20 58 23

PF Beglej - VA Dermantsi - VA Batultsi - VA Kalugerovo

700 700

Valchi Dol - Preselka

Total

120

20

PCI Details

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

No

Competition, Market Integration, Security of Supply, Sustainability

The modernization, rehabilitation and expansion of the existing gas transmission infrastructure will guarantee secure and reliable natural gas transmission, enhance the efficiency, reliability and flexibility of the transmission system and provide the required capacities and pressures. The implementation of the activities planned will secure the technical capabilities for transmission of additional natural gas quantities through the territory of the country, coming in through the existing and new entry and exit points, and opportunities for diversification of the directions of transmission depending on the market interest.

Specific Criteria Fulfilled Comments

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Made with