ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 187 of 620

NDP and PCI Information

Schedule

Start Date

End Date 06/2013 06/2017

Third-Party Access Regime

Part of NDP NDP Number

Pre-Feasibility

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (GRTgaz PDD 2015)

Regulated Regulated

Feasibility

na

07/2013

FEED Market Test Permitting Supply Contracts FID Construction Commissioning

No

Currently PCI

Exemption Granted

Yes (5.6)

Not Relevant

CBCA Decision Market Survey

Exemption in entry direction Exemption in exit direction

No

0.00% 0.00%

Not Relevant (no CBCA decision)

2022

2022

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

$UWqUH GX 1RUG (VW

Total or partial looping

1,050

87

0

New compression station to be created depending on the amount of capacity to be created (total additional compression power for the 3 stations is equal to 41 MW) Additional power depending on the amount of capacity to be created (total additional compression power for the 3 stations is equal to 41 MW)

Cheppy CS

Dierrey CS

Morelmaison CS

Adaptation of station functionality

0

Obergailbach interconnection station

Enabling reverse flow

Additional power depending on the amount of capacity to be created (total additional compression power for the 3 stations is equal to 41 MW) Total

Voisines CS

87

0

PCI Details

PCI Benefits

Project concerns investment in reverse flow capacity

General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Competition, Market Integration, Security of Supply, Sustainability

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM