NDP and PCI Information

Schedule

Start Date

End Date 12/2010 08/2015 12/2016 06/2012

Third-Party Access Regime

Part of NDP NDP Number

Pre-Feasibility

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (GRTgaz PDD 2015)

Regulated Regulated

Feasibility

na

10/2014 09/2015

FEED

No

Currently PCI

Market Test

Exemption Granted

No

Not Relevant

Permitting Supply Contracts

CBCA Decision Market Survey

Exemption in entry direction Exemption in exit direction

No

0.00% 0.00%

01/2017 07/2015 12/2017

Not Relevant (no CBCA decision)

FID

Construction

03/2017

Commissioning

2018

2018

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Morelmaison CS

Enable reverse flow from Oltingue

0 0 0

Oltingue interconnection station

Enable reverse flow

Total

Expected Gas Sourcing

Algeria, Caspian Region, Libya, LNG ()

Benefits

Main Driver Market Demand Main Driver Explanation During last open seaon on the project, shippers have confirmed their interest for reverse capacitites at the Oltingue / Rodersdorf IP. Benefit Description