ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 182 of 620
NDP and PCI Information
Schedule
Start Date
End Date 07/2012 07/2013 07/2014 03/2014 06/2016 08/2016 09/2015 11/2018
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (GRTgaz PDD 2015)
Regulated Regulated
Feasibility
na
09/2012 07/2013
FEED
No
Currently PCI
Market Test Permitting
Exemption Granted
Yes (5.7)
Not Relevant
10/2014
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
Supply Contracts
No
0.00% 0.00%
Not Relevant (no CBCA decision)
FID
Construction
06/2016
Commissioning
2018
2018
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Bourgogne
/RRSLQJ RI $UWqUH GH %RXUJRJQH SLSHOLQH
1,200
189
Etrez CS
9 0 0 9
Palleau CS Voisines CS
Adaptation of station functionalities Adaptation of station functionalities
Total
189
PCI Details
PCI Benefits General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply, Sustainability
The project, in addition to Gascogne Midi project, will remove the current bottleneck between North and South of France and thus enable the creation of a single market zone in France, considerably improving market integration in Western Europe and price convergence between northern and souther markets, currently submitted to LNG prices. By removing the bottleneck from North to South of France, dependence of the South of France and Iberian Peninsula to LNG will be reduced.
Specific Criteria Fulfilled Comments
Time Schedule
Grant Obtention Date Delay Since Last TYNDP
01/09/2015