ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 175 of 620

NDP and PCI Information

Schedule

Start Date

End Date 01/2017 06/2017 06/2018 06/2017 01/2019 01/2019 01/2019 01/2020

Third-Party Access Regime

Pre-Feasibility

Considered TPA Regime Considered Tariff Regime Applied for Exemption

No (The last approved Spanish NDP ended in 2016. The Royal Decree-Law 13/2012 cancel the process of obtaining administrative authorization to transport pipelines and metering regulation stations even if they were included in this NDP.This Project was included in the NDP 2008- 2016.)

Regulated Regulated

Feasibility

01/2017 06/2017

FEED

No

Part of NDP

Market Test Permitting

Exemption Granted

Not Relevant

06/2017

Exemption in entry direction Exemption in exit direction

Supply Contracts

0.00% 0.00%

FID

NDP Number

N/A

Construction

01/2019

Commissioning

2020

2020

Currently PCI

No

CBCA Decision Market Survey

No

Not Relevant (no CBCA decision)

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

It is necessary the increase of the compressor station of Zamora. This infrastructure should be associated to the third Interconnection point with Portugal

Guitiriz Zamora

762

320

16,840

Total

320

16,840

PCI Details

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Expected Gas Sourcing

Algeria, LNG (WO)

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM