Page 172 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Pre-Feasibility Feasibility FEED Market Test
Considered TPA Regime Considered Tariff Regime Applied for Exemption
No (The project was not included in the last NDP that was published in 2008. The project was identified later on, and was
Regulated Regulated
01/2017
05/2018 03/2018
No No
selected as PCI by the European Commission in 2013 and in 2015. Additionally, this project is being
Part of NDP
Exemption Granted
Permitting Supply Contracts FID Construction Commissioning
considered in the High Level Group on Interconnections for South-West Europe. )
Exemption in entry direction Exemption in exit direction
0.00% 0.00%
NDP Number
2025
2025
Currently PCI
Yes (5.4)
CBCA Decision Market Survey
No
Not Relevant (no CBCA decision)
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Castropodame - Zamora
600 740 740 740 800
170
Guitiriz - Lugo
28 90 30
Lugo - Villafranca del Bierzo
Villafranca del Bierzo - Castropodame
Zamora - La Barbolla - Adradas
307 625
Total
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Security of Supply
Specific Criteria Fulfilled Comments