ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 172 of 620

NDP and PCI Information

Schedule

Start Date

End Date

Third-Party Access Regime

Pre-Feasibility Feasibility FEED Market Test

Considered TPA Regime Considered Tariff Regime Applied for Exemption

No (The project was not included in the last NDP that was published in 2008. The project was identified later on, and was

Regulated Regulated

01/2017

05/2018 03/2018

No No

selected as PCI by the European Commission in 2013 and in 2015. Additionally, this project is being

Part of NDP

Exemption Granted

Permitting Supply Contracts FID Construction Commissioning

considered in the High Level Group on Interconnections for South-West Europe. )

Exemption in entry direction Exemption in exit direction

0.00% 0.00%

NDP Number

2025

2025

Currently PCI

Yes (5.4)

CBCA Decision Market Survey

No

Not Relevant (no CBCA decision)

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Castropodame - Zamora

600 740 740 740 800

170

Guitiriz - Lugo

28 90 30

Lugo - Villafranca del Bierzo

Villafranca del Bierzo - Castropodame

Zamora - La Barbolla - Adradas

307 625

Total

PCI Details

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Security of Supply

Specific Criteria Fulfilled Comments

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Made with