ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 169 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Pre-Feasibility Feasibility
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Regulated Regulated Part of NDP 01/2008 01/2018 01/2010 05/2019 03/2018 12/2020 NDP Number No code in the NDP FEED No No Market Test Permitting Exemption Granted Currently PCI Yes (5.5) 09/2018 Exemption in entry direction Exemption in exit direction Supply Contracts FID 0.00% 0.00% CBCA Decision Market Survey No 05/2019 12/2022 Not Relevant (no CBCA decision) Construction 01/2021 Commissioning 2022 2022 Pipelines and Compressor Stations Pipeline Section Pipeline Comment Diameter (mm) Length (km) Compressor Power (MW) Loop Castelnou ² Villar de Arnedo + CS Zaragoza (increment) Loop Tivissa ² $UEyV &6 7LYLVVD ILOWHUV &6 $UEyV (increment) Date of Comissioning: December 2022 640 214 5 Date of Comissioning: December 2022 740 114 21 Total 328 26 PCI Details Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity PCI Benefits General Criteria Fulfilled Specific Criteria Fulfilled No Competition, Market Integration, Security of Supply, Sustainability ENTSOG PS-CBA demonstrates visible benefits for MidCat. A better market integration of the Iberian Peninsula will be traduced by a price convergence between Spain and France. Regarding competition, with the MidCat project France will improve the possibility to take benefit from a cheaper LNG price or Algerian gas. At European level, the MidCat project can be considered as a way to reduce the dependency from Russian gas and therefore to improve the overall security of supply, as it reinforce the direct link between North Africa and Europe. This project improves the CO2 emissions in several cases by making the gas cheaper than coal and replacing coal in specific zones. Specific Criteria Fulfilled Comments Time Schedule Grant Obtention Date 19/01/2016 Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Made with FlippingBook