ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 169 of 620

NDP and PCI Information

Schedule

Start Date

End Date

Third-Party Access Regime

Pre-Feasibility Feasibility

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Regulated Regulated

Part of NDP

01/2008 01/2018

01/2010 05/2019 03/2018 12/2020

NDP Number

No code in the NDP

FEED

No No

Market Test Permitting

Exemption Granted

Currently PCI

Yes (5.5)

09/2018

Exemption in entry direction Exemption in exit direction

Supply Contracts FID

0.00% 0.00%

CBCA Decision Market Survey

No

05/2019 12/2022

Not Relevant (no CBCA decision)

Construction

01/2021

Commissioning

2022

2022

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Loop Castelnou ² Villar de Arnedo + CS Zaragoza (increment) Loop Tivissa ² $UEyV &6 7LYLVVD ILOWHUV &6 $UEyV (increment)

Date of Comissioning: December 2022

640

214

5

Date of Comissioning: December 2022

740

114

21

Total

328

26

PCI Details

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

No

Competition, Market Integration, Security of Supply, Sustainability

ENTSOG PS-CBA demonstrates visible benefits for MidCat. ‡ A better market integration of the Iberian Peninsula will be traduced by a price convergence between Spain and France. ‡ Regarding competition, with the MidCat project France will improve the possibility to take benefit from a cheaper LNG price or Algerian gas. ‡ At European level, the MidCat project can be considered as a way to reduce the dependency from Russian gas and therefore to improve the overall security of supply, as it reinforce the direct link between North Africa and Europe. ‡ This project improves the CO2 emissions in several cases by making the gas cheaper than coal and replacing coal in specific zones.

Specific Criteria Fulfilled Comments

Time Schedule

Grant Obtention Date

19/01/2016