ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 142 of 620
NDP and PCI Information
Schedule
Start Date
End Date 01/2009 01/2009 12/2016 03/2017 12/2019
Third-Party Access Regime
Pre-Feasibility
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Regulated Regulated Part of NDP Feasibility 01/2009 01/2016 NDP Number No code in the NDP FEED No No Market Test Permitting Exemption Granted Currently PCI Yes (5.5) 07/2016 Exemption in entry direction Exemption in exit direction Supply Contracts FID 0.00% 0.00% CBCA Decision Market Survey No 07/2017 12/2021 Not Relevant (no CBCA decision) Construction 04/2020 Commissioning 2021 2021 Pipelines and Compressor Stations Pipeline Section Pipeline Comment Diameter (mm) Length (km) Compressor Power (MW) CS Martorell Date of Comissioning: December 2021 Date of Comissioning: December 2021 Date of Comissioning: December 2021 36 Hostalrich - Figueras 900 900 79 28 Pipeline Figueras - French Border Total 107 36 PCI Details Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity PCI Benefits General Criteria Fulfilled Specific Criteria Fulfilled Yes Competition, Market Integration, Security of Supply, Sustainability This project was not simulated in PS-CBA of TYNDP 2015. Nevertheless, its benefits are expected to be similar to the ones of Full MidCat. ENTSOG PS-CBA demonstrated visible benefits for this project: A better market integration of the Iberian Peninsula will be traduced by a price convergence between Spain and France Regarding competition, this project will improve the possibility to take benefit from a cheaper LNG price or Algerian gas. At EU level, it can be considered as a way to reduce the dependency from RU gas and therefore to improve the overall security of supply. This project improves the CO2 emissions in several cases by making the gas cheaper than coal and replacing coal in specific zones. Specific Criteria Fulfilled Comments Time Schedule Grant Obtention Date 19/01/2016 Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Made with FlippingBook