ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 135 of 620
Tallinn LNG
LNG-N-962 Update Date
Project
LNG Terminal
Non-FID
Non-Advanced
10/06/2016
Conventional LNG import terminal bunkering, break bulk, on grid and off grid land transportation for improving Baltic as well as Finnish security of supply and serving commercial customers. The project includes 6x800 m3 pressurized bullets, connection to the existing berth LOA 198 m; depth m 2x100m3/h truck loading rack and connection to the low pressure natural gas distribution network located about 1 km from terminal site, covering about 60% of Estonian gas demand. And one to four flat bottom storage tanks with the total LNG storage capacity of 50 000 m3 to 320 000 m3, with second connection to the berth LOA 365m depth m capable of handling any size LNG carrier on the market, connection to DN711 MOP 54 bar national high pressure grid located about 13 km from the terminal site. Rail shunting tracks are 200m. Current scope is envisaged to 160 000 m3 x80 000 m3 tanks with 4 bcma connection to the national high pressure grid. (grid connection on separate CAPEX).
Description
Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point
Operator
Year 2019
From Gas System To Gas System Capacity
Tallinn LNG
121.0 GWh/d
Vopak / Elering
LNG_Tk_EE
EE
Sponsors Vopak / Vopak E.O.S.
General Information
75%
Vopak E.O.S. AS / Vopak LNG Holdings B.V/ Port of Tallinn AS
Promoter
Port of Tallinn
25%
Operator
Vopak / Elering
Host Country
Estonia Planned
Status
Website
Project's URL
Publication Approval Status
Approved
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM