ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 135 of 620

Tallinn LNG

LNG-N-962 Update Date

Project

LNG Terminal

Non-FID

Non-Advanced

10/06/2016

Conventional LNG import terminal bunkering, break bulk, on grid and off grid land transportation for improving Baltic as well as Finnish security of supply and serving commercial customers. The project includes 6x800 m3 pressurized bullets, connection to the existing berth LOA 198 m; depth m 2x100m3/h truck loading rack and connection to the low pressure natural gas distribution network located about 1 km from terminal site, covering about 60% of Estonian gas demand. And one to four flat bottom storage tanks with the total LNG storage capacity of 50 000 m3 to 320 000 m3, with second connection to the berth LOA 365m depth m capable of handling any size LNG carrier on the market, connection to DN711 MOP 54 bar national high pressure grid located about 13 km from the terminal site. Rail shunting tracks are 200m. Current scope is envisaged to 160 000 m3 x80 000 m3 tanks with 4 bcma connection to the national high pressure grid. (grid connection on separate CAPEX).

Description

Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point

Operator

Year 2019

From Gas System To Gas System Capacity

Tallinn LNG

121.0 GWh/d

Vopak / Elering

LNG_Tk_EE

EE

Sponsors Vopak / Vopak E.O.S.

General Information

75%

Vopak E.O.S. AS / Vopak LNG Holdings B.V/ Port of Tallinn AS

Promoter

Port of Tallinn

25%

Operator

Vopak / Elering

Host Country

Estonia Planned

Status

Website

Project's URL

Publication Approval Status

Approved

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Made with