ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 129 of 620

Balticconnector

TRA-N-895 Update Date

Project

Pipeline including CS

Non-FID Advanced

20/05/2016

New bidirectional offshore pipeline Inkoo Paldiski, DN500, 80 bar of 80 km, plus 50 km onshore pipeline in EE Kiili Paldiski pipeline, DN 700, 55 bar and 20 km onshore pipeline in FI Siuntio Inkoo pipeline, DN500, 80 bar including metering and compressor stations at both ends with a daily nominal capacity of 7.2 mcm/day. The power of each compressor station is about 10 MW. The Regulators of Finland Energiavirasto and Estonia Konkurentsiamet have made a common CBCA decision for the Balticconnector and Estonia Latvia interconnection project.

Description

Regulatory Decisions and similar material conditions

Capacity Increments Variant For Modelling Point

Operator Elering AS Elering AS

Year 2019 2019

From Gas System To Gas System Capacity

79.0 GWh/d 79.0 GWh/d

EE

FI/BAC

Balticonnector / Paldiski (EE)

FI/BAC

EE

Sponsors EE Kiili pressure reduction station Elering AS

General Information

Promoter Operator

Elering AS Elering AS

100%

Host Country

Estonia Planned

EE Kiili-Paldiski pipeline Elering AS

Status

100%

Website

Project's URL

EE Paldiski metering and Compressor station Elering AS FI Inkoo metering and compressor station Baltic Connector OY

Publication Approval Status

Approved

100%

100%

FI Inkoo-Siuntio pipeline Baltic Connector OY

100%

FI-EE Inkoo-Paldiski Offshore pipeline Baltic Connector OY

50%

Elering AS

50%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM