Balticconnector
TRA-N-895 Update Date
Project
Pipeline including CS
Non-FID Advanced
20/05/2016
New bidirectional offshore pipeline Inkoo Paldiski, DN500, 80 bar of 80 km, plus 50 km onshore pipeline in EE Kiili Paldiski pipeline, DN 700, 55 bar and 20 km onshore pipeline in FI Siuntio Inkoo pipeline, DN500, 80 bar including metering and compressor stations at both ends with a daily nominal capacity of 7.2 mcm/day. The power of each compressor station is about 10 MW. The Regulators of Finland Energiavirasto and Estonia Konkurentsiamet have made a common CBCA decision for the Balticconnector and Estonia Latvia interconnection project.
Description
Regulatory Decisions and similar material conditions
Capacity Increments Variant For Modelling Point
Operator Elering AS Elering AS
Year 2019 2019
From Gas System To Gas System Capacity
79.0 GWh/d 79.0 GWh/d
EE
FI/BAC
Balticonnector / Paldiski (EE)
FI/BAC
EE
Sponsors EE Kiili pressure reduction station Elering AS
General Information
Promoter Operator
Elering AS Elering AS
100%
Host Country
Estonia Planned
EE Kiili-Paldiski pipeline Elering AS
Status
100%
Website
Project's URL
EE Paldiski metering and Compressor station Elering AS FI Inkoo metering and compressor station Baltic Connector OY
Publication Approval Status
Approved
100%
100%
FI Inkoo-Siuntio pipeline Baltic Connector OY
100%
FI-EE Inkoo-Paldiski Offshore pipeline Baltic Connector OY
50%
Elering AS
50%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM