ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 125 of 620
TRA-N-394 Gassled - Danish upstream system
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Pre-Feasibility Feasibility
Considered TPA Regime Considered Tariff Regime Applied for Exemption
No (Presently a feasibility study for the Baltic Pipe is carried out in cooperation between Gaz-System (Polish TSO) and Energinet.dk. The study will be finalized by end of 2016. If the study recommends a capacity of Baltic Pipe well above 3 bcm/y , this reinforcement project will be included in NDP.)
Regulated Regulated
09/2015
12/2016
FEED Market Test Permitting Supply Contracts FID Construction Commissioning
Yes Yes
Part of NDP
Exemption Granted
Exemption in entry direction Exemption in exit direction
0.00% 0.00%
NDP Number
2022
2022
Currently PCI
No
CBCA Decision Market Survey
No
Not Relevant (no CBCA decision)
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Benefits
Main Driver
Market Demand
Main Driver Explanation Benefit Description
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Made with FlippingBook