ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 125 of 620

TRA-N-394 Gassled - Danish upstream system

NDP and PCI Information

Schedule

Start Date

End Date

Third-Party Access Regime

Pre-Feasibility Feasibility

Considered TPA Regime Considered Tariff Regime Applied for Exemption

No (Presently a feasibility study for the Baltic Pipe is carried out in cooperation between Gaz-System (Polish TSO) and Energinet.dk. The study will be finalized by end of 2016. If the study recommends a capacity of Baltic Pipe well above 3 bcm/y , this reinforcement project will be included in NDP.)

Regulated Regulated

09/2015

12/2016

FEED Market Test Permitting Supply Contracts FID Construction Commissioning

Yes Yes

Part of NDP

Exemption Granted

Exemption in entry direction Exemption in exit direction

0.00% 0.00%

NDP Number

2022

2022

Currently PCI

No

CBCA Decision Market Survey

No

Not Relevant (no CBCA decision)

PCI Details

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Benefits

Main Driver

Market Demand

Main Driver Explanation Benefit Description

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM