ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 121 of 620
(Mirror) Baltic Pipe
TRA-N-428 Update Date
Project
Pipeline including CS
Non-FID
Non-Advanced
20/05/2016
7KLV LV D PLUURU SURMHFW IRU WKH %DOWLF 3LSH SURPRWHG E\ *D] 6\VWHP 6 $ (QWU\ ([LW LV 'UDJ¡U LQ 'HQPDUN DQG 1LHFKRU]H LQ 3RODQG 7KH LGHQWLILHG feasible infrastructure solution is a 3-10 bcm/y upstream connection from the Northsea gas-fields to Deanmark with transport through the Danish transmission system to Entry/Exit point of Baltic Pipe and further transport through Baltic Pipe to Niechorze (entry/exit) in Poland. In accordance with the ungoing feasibility study, Energinet.dk·s mirror project is: - capacity increment ² GWh/d (10 bcm/y) from DK=>PL and 91.1 GWh/d (3bcm/y) from PL => DK - year of commissioning ² FID status ² no - PCI status ² yes
Description
Regulatory Decisions and similar material conditions
Capacity Increments Variant For Modelling Point
Operator
Year 2022 2022
From Gas System To Gas System Capacity
306.8 GWh/d 91.1 GWh/d
Energinet.dk Energinet.dk
DK
PL
Interconnector PL-DK
PL
DK
Sponsors
General Information
Promoter Operator
Energinet.dk Energinet.dk
Host Country
Denmark Planned
Status
Website Publication Approval Status
Approved
Enabled Projects
Project Code Project Name TRA-N-394 Gassled - Danish upstream system TRA-N-780 Nybro-Interconnector PL-DK - reinforcement
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM