ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 119 of 620

NDP and PCI Information

Schedule

Start Date

End Date

Third-Party Access Regime

Pre-Feasibility Feasibility

Considered TPA Regime Considered Tariff Regime Applied for Exemption

No (This is an upstream project from the North Sea (Norway) to a Danish North Sea Platform. The project is vital for the Baltic- Pipe project (gas pipeline between Denmark and Poland). The project will be included in future national plans in connection when possibly including the Baltic Pipe.)

Not Applicable Not Applicable Not Relevant Not Relevant

09/2015

12/2016

FEED Market Test Permitting Supply Contracts FID Construction Commissioning

Part of NDP

Exemption Granted

Exemption in entry direction Exemption in exit direction

0.00% 0.00%

NDP Number

2022

2022

Currently PCI

No

CBCA Decision Market Survey

No

Not Relevant (no CBCA decision)

PCI Details

PCI Benefits General Criteria Fulfilled Specific Criteria Fulfilled

No

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Benefits

Main Driver

Market Demand

Main Driver Explanation Benefit Description

Barriers

Barrier Type

Description

Currently negotiations are ongoing with Norwegian partner. An important issue is the coordination with the Baltic pipe project (connection between DK and PL).

Market

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM