ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 11 of 620

NDP and PCI Information

Schedule

Start Date

End Date

Third-Party Access Regime

Pre-Feasibility Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (Coordinated Network Development Plan 2017-2026)

Regulated Regulated

Part of NDP

NDP Number

TAG 2016/03

No

Exemption Granted

Not Relevant

Currently PCI

No

Exemption in entry direction Exemption in exit direction

0.00% 0.00%

CBCA Decision Market Survey

No

Not Relevant (no CBCA decision)

2018

2018

PCI Details

PCI Benefits

Project concerns investment in reverse flow capacity

General Criteria Fulfilled Specific Criteria Fulfilled

No

Market Integration, Security of Supply

Specific Criteria Fulfilled Comments

Benefits

Main Driver

Others

The planning project was triggered by an obligation arising out of the decree of the Austrian regulatory authority, E-Control related to the Coordinated Network Development Plan 2016-2025, whereas a reverse flow of the TAG pipeline system shall be assessed by also taking into consideration potential entry FZK capacity at the IP Ceršak/Murfeld. As a consequence, TAG GmbH also assesses an upgrade of existing entry DZK capacity to entry FZK capacity at the IP Arnoldstein/Tarvisio and, correspondingly, an upgrade of existing backhaul capacity ´Exit Baumgartenµ to FZK capacity ´Exit Baumgartenµ of TAG GmbH in its projects variations.

Main Driver Explanation

Benefit Description

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Made with