ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 11 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Pre-Feasibility Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (Coordinated Network Development Plan 2017-2026)
Regulated Regulated
Part of NDP
NDP Number
TAG 2016/03
No
Exemption Granted
Not Relevant
Currently PCI
No
Exemption in entry direction Exemption in exit direction
0.00% 0.00%
CBCA Decision Market Survey
No
Not Relevant (no CBCA decision)
2018
2018
PCI Details
PCI Benefits
Project concerns investment in reverse flow capacity
General Criteria Fulfilled Specific Criteria Fulfilled
No
Market Integration, Security of Supply
Specific Criteria Fulfilled Comments
Benefits
Main Driver
Others
The planning project was triggered by an obligation arising out of the decree of the Austrian regulatory authority, E-Control related to the Coordinated Network Development Plan 2016-2025, whereas a reverse flow of the TAG pipeline system shall be assessed by also taking into consideration potential entry FZK capacity at the IP Ceršak/Murfeld. As a consequence, TAG GmbH also assesses an upgrade of existing entry DZK capacity to entry FZK capacity at the IP Arnoldstein/Tarvisio and, correspondingly, an upgrade of existing backhaul capacity ´Exit Baumgartenµ to FZK capacity ´Exit Baumgartenµ of TAG GmbH in its projects variations.
Main Driver Explanation
Benefit Description
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM