ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 90 of 620

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Compressor station "Werne"

49 49

Total

Benefits

Main Driver

Market Demand

Main Driver Explanation

Increase of the transmission capacity from the Open Grid Europe grid to the bayernets grid, the terranets bw grid, the Thyssengas grid and the underground gas storages Etzel in Germany as well as the underground gas storages 7Fields and Haidach in Austria. Support of the transmission of high- calorific gas to regions which are currently supplied by declining low-calorific gas.

Benefit Description

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Made with