ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 90 of 620
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Compressor station "Werne"
49 49
Total
Benefits
Main Driver
Market Demand
Main Driver Explanation
Increase of the transmission capacity from the Open Grid Europe grid to the bayernets grid, the terranets bw grid, the Thyssengas grid and the underground gas storages Etzel in Germany as well as the underground gas storages 7Fields and Haidach in Austria. Support of the transmission of high- calorific gas to regions which are currently supplied by declining low-calorific gas.
Benefit Description
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Made with FlippingBook