Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Pipeline "Forchheim-Finsing" Pipeline "Schwandorf-Forchheim"

1,000 1,000

79 62

Total

141

Benefits

Main Driver

Market Demand

Main Driver Explanation Benefit Description

Increase of the transmission capacity from the Open Grid Europe grid to the bayernets grid and the underground gas storages 7Fields and Haidach in Austria

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM