ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 86 of 620
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Pipeline "Forchheim-Finsing" Pipeline "Schwandorf-Forchheim"
1,000 1,000
79 62
Total
141
Benefits
Main Driver
Market Demand
Main Driver Explanation Benefit Description
Increase of the transmission capacity from the Open Grid Europe grid to the bayernets grid and the underground gas storages 7Fields and Haidach in Austria
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Made with FlippingBook