ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 7 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test Permitting
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (NDP 2016 - 2025)
Regulated Regulated
GCA 2015/05
Yes Yes
Currently PCI
Exemption Granted
Yes (6.24.3)
10/2015
07/2017
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
No
Supply Contracts FID Construction Commissioning
0.00% 0.00%
Not Relevant (no CBCA decision)
10/2020
2020
2020
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
The technical load factor of the pipeline is confidential and must not be published in the TYNDP. Total
Mosonmagyarovar
PCI Details
PCI Benefits General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Benefits
Main Driver Market Demand Main Driver Explanation Pipeline projects are planned according to market demand. Current planning is based on market indications. Benefit Description
Strenthening the establishment of a potential Southern Corridor and contribution to a diversification of sources e.g. Black Sea Gas.
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM