ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 69 of 620

Capacity4Gas (C4G) ² CZ/AT

TRA-N-919 Update Date

Project

Pipeline including CS

Non-FID Advanced

06/05/2016

The project Capacity4Gas (C4G) represents 3 specific projects, which deal with increase of cross-market capacities at 3 different borders and were developed in the context of a non-binding market survey performed at the beginning of 2016. The market survey was focused on an assessment of the need for new transmission capacity between the Czech Republic and adjacent market areas. The 3 projects are (1) C4G ² DE/CZ, i.e. entry capacity increase between DE (Gaspool) and CZ, (2a) C4G ² CZ/SK, i.e. exit capacity increase between CZ and SK, (2b) C4G ² CZ/AT, i.e. exit capacity increase between CZ and AT. The projects (2a) and (2b) are alternatives.

Description

Regulatory Decisions and similar material conditions

Capacity Increments Variant For Modelling Point

Operator

Year 2020

From Gas System To Gas System Capacity

1,000.0 GWh/d

NET4GAS, s.r.o.

CZ

AT

Comment: The incremental capacity represents approx. exit capacity extension above planned exit capacity of the project BACI at CZ/AT border (the project C4G ² CZ/AT is an alternative to exit capacity extension at CZ/SK border, the project C4G ² CZ/SK).

3RäWRUQi 5HLQWDO

Sponsors Austria GAS CONNECT AUSTRIA GmbH

General Information

Promoter Operator

NET4GAS, s.r.o. NET4GAS, s.r.o.

100%

Host Country

Czechia Planned

Czech Republic NET4GAS, s.r.o.

Status

100%

Website Publication Approval Status

Approved

Enabled Projects

Project Code Project Name TRA-N-133 Bidirectional Austrian Czech Interconnection (BACI)

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Made with